Homeowners in Bellevue had a driveway which was elevated from the main street. They
wanted to convert the driveway to street level and build a 2-car garage with an elevator.

We first broke out the concrete driveway

Another view

We used the excavator to remove the concrete.

Concrete removal in process

Removal of the dirt in the driveway





Hundreds of cubic yards of soil need to be removed.



Footings poured on the right side



Continued dirt removal and prep for foundation



Footing and wall prep

Rebar for foundation walls

Wall forms being set


Walls poured and framing (by another company)