top of page
Homeowners in Bellevue had a driveway which was elevated from the main street. They
wanted to convert the driveway to street level and build a 2-car garage with an elevator.
We first broke out the concrete driveway
Another view
We used the excavator to remove the concrete.
Concrete removal in process
Removal of the dirt in the driveway
Hundreds of cubic yards of soil need to be removed.
Footings poured on the right side
Continued dirt removal and prep for foundation
Footing and wall prep
Rebar for foundation walls
Wall forms being set
Walls poured and framing (by another company)
bottom of page